Category: EBL Signalling Project

The EBL team held the first formal operations session at the June meet. The team used the recently commissioned CTC signalling system, a full suite of prototype style train order paperwork to authorise movements and for some trains car cards

Since late 2014 the Essex Belt Lines has been upgraded to incorporate a full CTC signalling system, with dispatcher control of mainline turnouts using JMRI installed onto a Raspberry Pi 2. In addition to the signalling upgrade this also provides

Top